VOSS GmbH

Sprache/Language |

VOSS Fluid - technews

05.08.2011 Corrosion resistance test of crimped ORFS union nuts

16.12.2010 Pressure stage increase - Straight male stud couplings with UN/UNF thread

06.01.2011 Pressure reductions and temperatures

03.12.2010 Addition to the product range T-banjo couplings compact version – high pressure

16.12.2010 Pressure stage increase - Straight male stud couplings with sealing edge

02.07.2010 VOSS 2S plus cutting rings, assembled on PA-12 tubes

11.06.2010 Ozone Resistance of Elastomer Seals

13.10.2010 Pre-assembly mandrels for cutting ring assembly made of high performance material

07.05.2010 VOSS Fluid product approvals for gas applications according to DVGW

24.03.2010 Compatibility of VOSS Zink-Nickel in combination with Tyfocor L 30%

24.03.2010 Tool holder for pre-assembly devices Type 80 und Type 90

29.01.2010 Cone gauges for preassembly studs

04.11.2009 VOSSFormSQRVA – approved stainless steel materials

25.08.2009 Correct inspection of VOSSFormSQR tube contour

28.04.2009 New DVD Practice Workshop - Tube Connection

28.04.2009 New CD-ROM CAD-Catalogue

08.12.2008 Reprint of the product brochure for ES-4 cutting ring fittings

28.04.2009 VOSS Fluid assembly instructions in Russian

21.11.2008 Corrosion resistance of VOSS weld nipples with O-ring seal by phosphating

07.11.2008 Assembly instructions in standard paper size DIN A3 – PDF files

17.09.2008 VOSS blanking screws – from now on furnished with lubricant coated screw in threads