VOSS coat-Kompetenz-Zentrum

The parent plant has been home the 5,000 m2 VOSS coat competence centre since 2009. The plant facility is a two-storey structure to ensure optimum working conditions. All movements of goods and loading of the rack and drum plant are realised on the ground floor. A lifting system then conveys these to the upper floor. The actual galvanised coating process is realised here fully automatically. All processing steps can be controled here and optimise these to suit our own needs. Uncompromisingly. Sustainably

Process chemistry - a solid base for VOSS coat. Automatic in-process chemical dosage to baths ensures conformity to even the tightest process tolerances.
Process chemistry - a solid base for VOSS coat. Automatic in-process chemical dosage to baths ensures conformity to even the tightest process tolerances.
The entire operation of the system is in the basement. All process steps and parameters are visualized in real time.
The entire operation of the system is in the basement. All process steps and parameters are visualized in real time.
The design of the overall plant technology helps to prevent thread damage.
The design of the overall plant technology helps to prevent thread damage.
All bath parameters are monitored continuously. Re-dosing is fully automated.
All bath parameters are monitored continuously. Re-dosing is fully automated.
Process optimization ensures that the actual period during which products are located inside the drum is much less than with other electroplating systems. This additionally protects the material.
Process optimization ensures that the actual period during which products are located inside the drum is much less than with other electroplating systems. This additionally protects the material.
Customized after-treatment is possible thanks to flexible plant control.
Customized after-treatment is possible thanks to flexible plant control.
After the coating process, each batch is quality controlled to a high standard. The coating thickness and the chemical composition are checked and documented during this procedure.
After the coating process, each batch is quality controlled to a high standard. The coating thickness and the chemical composition are checked and documented during this procedure.
Waste air is extracted directly above the baths and cleaned by an air washer. The available heat energy is recovered.